Here is a look at the structural assembly of this two-storey single-family home currently under construction in Córdoba, built using our EcoFrame industrialized construction system.
Within just a few days, the high-performance galvanized steel structure takes shape, clearly defining the layout and volumes of the house.
• Fast and efficient assembly
• 100% dry construction process
• High strength and durability
• Fully adaptable to any architectural design
With the EcoFrame system, the structural frame can be completed in around one week, without the need for special machinery or complex on-site processes, helping optimize construction time, costs and execution control.
Technology, industrialization and sustainability shaping a new way of building.
Project by LMV Arquitectos